Cleaning, Inspecting, Assemby
 After
the completion of the carving, the mausoleum pieces are then
moved to an area where the rubber mask is removed and the
stone is completely washed and dried. Once dried, it is time
for the Quality Control Inspector to carefully compare the
original order and design to make certain that the mausoleum
parts are complete and error free. Only after each piece completes
inspection and receives a passing grade from the Quality Control
Inspector is it moved to the crating area, where it is carefully
packaged in a wooden box and awaits transportation to be assembled
at its final destination. Smaller mausoleums are pre-assembled
at the Rock of Ages Craftsman Center and are loading onto
a flat-bed trailer and truck for transportion to its final
destination.
|